CEPO M&E executes M&E project with AES-VCM in Mon Duong 2 thermal power plants


CEPO M&E executes M&E project with AES-VCM in Mong

 Duong 2 thermal power plants


Mong Duong 2 thermal power plants with 1120 MW in capacity include 2 parts. The investment is approximately 2 billion dollars from AES corporation, Posco energy and China investment Corporation. The project is being in progress.

Receiving AES-VCM  cooperation offer, CEPO  has given  experience engineers to do survey, find problem and launch resolution for AES-VCM. AES-VCM has agreed with us and signed the contract for construction.

We do project with criteria Safety, effectively & quickly.


This projects is completed perfectly, we have done it as well as our first construction.


Pictures of project


thi-cong-he-thong-dien

Picture 1: CEPO engineers in Mong Duong 2 thermal power plants

thi-cong-he-thong-dien

Picture 2: CEPO engineers

thi-cong-he-thong-dien

Picture 3: CEPO engineer in construction

thi-cong-he-thong-dien

Picture 4: CEPO engineers is working in construction

thi-cong-he-thong-dien

Picture 5: CEPO engineers in construction

thi-cong-he-thong-ong-gio

                                 
  Electrical panels installation

thi-cong-he-thong-dien

Picture 5: CEPO engineers working on electrical panels

nha-may-nhiet-dien-mong-duong

Picture 6: CEPO engineer

nha-may-nhiet-dien-mong-duong

Picture 7: AES building Completed


If you have similar project. Don’t hesitate to contact with us via the following address


Address: 1F, A building, 301 Nguyen Trai, Thanh Xuan Dist., Hanoi

Tel: (+84) 3551 0669 

Phone: (+84) 912 052 866 (Mr. Thang)

Email: Please contact





Viewed: 2897
Yahoo