CEPO M&E executes M&E project with AES-VCM in Mong
Duong 2 thermal power plants
Mong Duong 2 thermal power plants with 1120 MW in capacity include 2 parts. The investment is approximately 2 billion dollars from AES corporation, Posco energy and China investment Corporation. The project is being in progress.
Receiving AES-VCM cooperation offer, CEPO has given experience engineers to do survey, find problem and launch resolution for AES-VCM. AES-VCM has agreed with us and signed the contract for construction.
We do project with criteria Safety, effectively & quickly.
This projects is completed perfectly, we have done it as well as our first construction.
Pictures of project

Picture 1: CEPO engineers in Mong Duong 2 thermal power plants

Picture 2: CEPO engineers

Picture 3: CEPO engineer in construction

Picture 4: CEPO engineers is working in construction

Picture 5: CEPO engineers in construction

Electrical panels installation

Picture 5: CEPO engineers working on electrical panels

Picture 6: CEPO engineer

Picture 7: AES building Completed
If you have similar project. Don’t hesitate to contact with us via the following address
Address: 1F, A building, 301 Nguyen Trai, Thanh Xuan Dist., Hanoi
Tel: (+84) 3551 0669
Phone: (+84) 912 052 866 (Mr. Thang)
Email: Please contact